Flash Electronics India Pvt. Ltd. Ev Plant-2
About the Project
Flash EV Plant-2 – Electrical Project Overview
The electrical infrastructure for Flash EV Plant-2 is currently under execution, with the goal of enhancing power capacity to support advanced EV manufacturing operations. Our ongoing work includes the SITC of power distribution systems, LT/HT cabling, transformer integration, power and control wiring, UPS networks, and a structured earthing system.
Lightning protection, cable trays, and safety accessories are being installed across production zones to ensure organized, secure, and efficient power flow. We are also providing regular on-site maintenance and monitoring during the execution phase to prevent faults and maintain smooth progress.
Once fully completed, Flash EV Plant-2 will operate on a stable, scalable, and future-ready electrical system designed for the growing EV manufacturing ecosystem.
Project Info
- Location: Pune
- Completion Date: Under Installation
- Category: Industrial Sector